f424b9cbb2
* chore(NA): majority of the changes needed to build elastic-datemath with bazel * chore(NA): add missing bits on elastic-datemath package * chore(NA): add missing build and watch scripts * chore(NA): remove build scripts for elastic datemah * chore(NA): remove typo from build baze production projects logs * chore(NA): force install on CI * chore(NA): introduce custom preserve symlinks resolver for jest * chore(NA): update jest integration snapshot * chore(NA): fix build for bazel packages * chore(NA): correctly copy bazel built packages into final distributable build * chore(NA): update kbn pm dist * chore(NA): experimental new logic to handle bazel yarn rule rerun using yarn-integrity file * chore(NA): update snapshots * refact(NA): ensure yarn integrity exists into two methods * chore(NA): fix ts error * chore(NA): update snapshots * chore(NA): update elastic-datemath build file to include ts_project rule * chore(NA): update basic optimization test snapshots * chore(NA): merge and solve conflicts cherry-pick from #96066 * chore(NA): update package.json and yarn.lock file * chore(NA): update bazel/bin into bazel-bin on kbn-pm build bazel packages Co-authored-by: Kibana Machine <42973632+kibanamachine@users.noreply.github.com>
10 lines
244 B
Python
10 lines
244 B
Python
# Expose those targets as they are required as part of
|
|
# other packages builds and need to be included as inputs
|
|
exports_files(
|
|
[
|
|
"tsconfig.base.json",
|
|
"tsconfig.json",
|
|
"package.json"
|
|
],
|
|
visibility = ["//visibility:public"]
|
|
)
|