pulumi/pkg/resource/deployment/snapshot.go

43 lines
1.9 KiB
Go
Raw Normal View History

// Licensed to Pulumi Corporation ("Pulumi") under one or more
// contributor license agreements. See the NOTICE file distributed with
// this work for additional information regarding copyright ownership.
// Pulumi licenses this file to You under the Apache License, Version 2.0
// (the "License"); you may not use this file except in compliance with
// the License. You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
Begin resource modeling and planning This change introduces a new package, pkg/resource, that will form the foundation for actually performing deployment plans and applications. It contains the following key abstractions: * resource.Provider is a wrapper around the CRUD operations exposed by underlying resource plugins. It will eventually defer to resource.Plugin, which itself defers -- over an RPC interface -- to the actual plugin, one per package exposing resources. The provider will also understand how to load, cache, and overall manage the lifetime of each plugin. * resource.Resource is the actual resource object. This is created from the overall evaluation object graph, but is simplified. It contains only serializable properties, for example. Inter-resource references are translated into serializable monikers as part of creating the resource. * resource.Moniker is a serializable string that uniquely identifies a resource in the Mu system. This is in contrast to resource IDs, which are generated by resource providers and generally opaque to the Mu system. See marapongo/mu#69 for more information about monikers and some of their challenges (namely, designing a stable algorithm). * resource.Snapshot is a "snapshot" taken from a graph of resources. This is a transitive closure of state representing one possible configuration of a given environment. This is what plans are created from. Eventually, two snapshots will be diffable, in order to perform incremental updates. One way of thinking about this is that a snapshot of the old world's state is advanced, one step at a time, until it reaches a desired snapshot of the new world's state. * resource.Plan is a plan for carrying out desired CRUD operations on a target environment. Each plan consists of zero-to-many Steps, each of which has a CRUD operation type, a resource target, and a next step. This is an enumerator because it is possible the plan will evolve -- and introduce new steps -- as it is carried out (hence, the Next() method). At the moment, this is linearized; eventually, we want to make this more "graph-like" so that we can exploit available parallelism within the dependencies. There are tons of TODOs remaining. However, the `mu plan` command is functioning with these new changes -- including colorization FTW -- so I'm landing it now. This is part of marapongo/mu#38 and marapongo/mu#41.
2017-02-17 21:31:48 +01:00
package deployment
Begin resource modeling and planning This change introduces a new package, pkg/resource, that will form the foundation for actually performing deployment plans and applications. It contains the following key abstractions: * resource.Provider is a wrapper around the CRUD operations exposed by underlying resource plugins. It will eventually defer to resource.Plugin, which itself defers -- over an RPC interface -- to the actual plugin, one per package exposing resources. The provider will also understand how to load, cache, and overall manage the lifetime of each plugin. * resource.Resource is the actual resource object. This is created from the overall evaluation object graph, but is simplified. It contains only serializable properties, for example. Inter-resource references are translated into serializable monikers as part of creating the resource. * resource.Moniker is a serializable string that uniquely identifies a resource in the Mu system. This is in contrast to resource IDs, which are generated by resource providers and generally opaque to the Mu system. See marapongo/mu#69 for more information about monikers and some of their challenges (namely, designing a stable algorithm). * resource.Snapshot is a "snapshot" taken from a graph of resources. This is a transitive closure of state representing one possible configuration of a given environment. This is what plans are created from. Eventually, two snapshots will be diffable, in order to perform incremental updates. One way of thinking about this is that a snapshot of the old world's state is advanced, one step at a time, until it reaches a desired snapshot of the new world's state. * resource.Plan is a plan for carrying out desired CRUD operations on a target environment. Each plan consists of zero-to-many Steps, each of which has a CRUD operation type, a resource target, and a next step. This is an enumerator because it is possible the plan will evolve -- and introduce new steps -- as it is carried out (hence, the Next() method). At the moment, this is linearized; eventually, we want to make this more "graph-like" so that we can exploit available parallelism within the dependencies. There are tons of TODOs remaining. However, the `mu plan` command is functioning with these new changes -- including colorization FTW -- so I'm landing it now. This is part of marapongo/mu#38 and marapongo/mu#41.
2017-02-17 21:31:48 +01:00
import (
"github.com/pulumi/lumi/pkg/compiler/core"
"github.com/pulumi/lumi/pkg/resource"
"github.com/pulumi/lumi/pkg/tokens"
Begin resource modeling and planning This change introduces a new package, pkg/resource, that will form the foundation for actually performing deployment plans and applications. It contains the following key abstractions: * resource.Provider is a wrapper around the CRUD operations exposed by underlying resource plugins. It will eventually defer to resource.Plugin, which itself defers -- over an RPC interface -- to the actual plugin, one per package exposing resources. The provider will also understand how to load, cache, and overall manage the lifetime of each plugin. * resource.Resource is the actual resource object. This is created from the overall evaluation object graph, but is simplified. It contains only serializable properties, for example. Inter-resource references are translated into serializable monikers as part of creating the resource. * resource.Moniker is a serializable string that uniquely identifies a resource in the Mu system. This is in contrast to resource IDs, which are generated by resource providers and generally opaque to the Mu system. See marapongo/mu#69 for more information about monikers and some of their challenges (namely, designing a stable algorithm). * resource.Snapshot is a "snapshot" taken from a graph of resources. This is a transitive closure of state representing one possible configuration of a given environment. This is what plans are created from. Eventually, two snapshots will be diffable, in order to perform incremental updates. One way of thinking about this is that a snapshot of the old world's state is advanced, one step at a time, until it reaches a desired snapshot of the new world's state. * resource.Plan is a plan for carrying out desired CRUD operations on a target environment. Each plan consists of zero-to-many Steps, each of which has a CRUD operation type, a resource target, and a next step. This is an enumerator because it is possible the plan will evolve -- and introduce new steps -- as it is carried out (hence, the Next() method). At the moment, this is linearized; eventually, we want to make this more "graph-like" so that we can exploit available parallelism within the dependencies. There are tons of TODOs remaining. However, the `mu plan` command is functioning with these new changes -- including colorization FTW -- so I'm landing it now. This is part of marapongo/mu#38 and marapongo/mu#41.
2017-02-17 21:31:48 +01:00
)
// Snapshot is a view of a collection of resources in an environment at a point in time. It describes resources; their
// IDs, names, and properties; their dependencies; and more. A snapshot is a diffable entity and can be used to create
// or apply an infrastructure deployment plan in order to make reality match the snapshot state.
type Snapshot struct {
Namespace tokens.QName // the namespace target being deployed into.
Pkg tokens.Package // the package from which this snapshot came.
Args core.Args // the arguments used to compile this package.
Resources []*resource.State // fetches all resources and their associated states.
Begin resource modeling and planning This change introduces a new package, pkg/resource, that will form the foundation for actually performing deployment plans and applications. It contains the following key abstractions: * resource.Provider is a wrapper around the CRUD operations exposed by underlying resource plugins. It will eventually defer to resource.Plugin, which itself defers -- over an RPC interface -- to the actual plugin, one per package exposing resources. The provider will also understand how to load, cache, and overall manage the lifetime of each plugin. * resource.Resource is the actual resource object. This is created from the overall evaluation object graph, but is simplified. It contains only serializable properties, for example. Inter-resource references are translated into serializable monikers as part of creating the resource. * resource.Moniker is a serializable string that uniquely identifies a resource in the Mu system. This is in contrast to resource IDs, which are generated by resource providers and generally opaque to the Mu system. See marapongo/mu#69 for more information about monikers and some of their challenges (namely, designing a stable algorithm). * resource.Snapshot is a "snapshot" taken from a graph of resources. This is a transitive closure of state representing one possible configuration of a given environment. This is what plans are created from. Eventually, two snapshots will be diffable, in order to perform incremental updates. One way of thinking about this is that a snapshot of the old world's state is advanced, one step at a time, until it reaches a desired snapshot of the new world's state. * resource.Plan is a plan for carrying out desired CRUD operations on a target environment. Each plan consists of zero-to-many Steps, each of which has a CRUD operation type, a resource target, and a next step. This is an enumerator because it is possible the plan will evolve -- and introduce new steps -- as it is carried out (hence, the Next() method). At the moment, this is linearized; eventually, we want to make this more "graph-like" so that we can exploit available parallelism within the dependencies. There are tons of TODOs remaining. However, the `mu plan` command is functioning with these new changes -- including colorization FTW -- so I'm landing it now. This is part of marapongo/mu#38 and marapongo/mu#41.
2017-02-17 21:31:48 +01:00
}
// NewSnapshot creates a snapshot from the given arguments. The resources must be in topologically sorted order.
func NewSnapshot(ns tokens.QName, pkg tokens.Package, args core.Args, resources []*resource.State) *Snapshot {
return &Snapshot{
Namespace: ns,
Pkg: pkg,
Args: args,
Resources: resources,
Begin resource modeling and planning This change introduces a new package, pkg/resource, that will form the foundation for actually performing deployment plans and applications. It contains the following key abstractions: * resource.Provider is a wrapper around the CRUD operations exposed by underlying resource plugins. It will eventually defer to resource.Plugin, which itself defers -- over an RPC interface -- to the actual plugin, one per package exposing resources. The provider will also understand how to load, cache, and overall manage the lifetime of each plugin. * resource.Resource is the actual resource object. This is created from the overall evaluation object graph, but is simplified. It contains only serializable properties, for example. Inter-resource references are translated into serializable monikers as part of creating the resource. * resource.Moniker is a serializable string that uniquely identifies a resource in the Mu system. This is in contrast to resource IDs, which are generated by resource providers and generally opaque to the Mu system. See marapongo/mu#69 for more information about monikers and some of their challenges (namely, designing a stable algorithm). * resource.Snapshot is a "snapshot" taken from a graph of resources. This is a transitive closure of state representing one possible configuration of a given environment. This is what plans are created from. Eventually, two snapshots will be diffable, in order to perform incremental updates. One way of thinking about this is that a snapshot of the old world's state is advanced, one step at a time, until it reaches a desired snapshot of the new world's state. * resource.Plan is a plan for carrying out desired CRUD operations on a target environment. Each plan consists of zero-to-many Steps, each of which has a CRUD operation type, a resource target, and a next step. This is an enumerator because it is possible the plan will evolve -- and introduce new steps -- as it is carried out (hence, the Next() method). At the moment, this is linearized; eventually, we want to make this more "graph-like" so that we can exploit available parallelism within the dependencies. There are tons of TODOs remaining. However, the `mu plan` command is functioning with these new changes -- including colorization FTW -- so I'm landing it now. This is part of marapongo/mu#38 and marapongo/mu#41.
2017-02-17 21:31:48 +01:00
}
}