Commit graph

11 commits

Author SHA1 Message Date
thatsIch
03e376c428 Typo Iteratable 2014-09-21 01:25:44 +02:00
AlgorithmX2
d77da8c62d Post Cache Construction Event should fire before things access grid caches. 2014-06-28 00:21:37 -05:00
AlgorithmX2
d807812bc8 Buffer changes from Interest List. 2014-06-10 12:16:14 -05:00
AlgorithmX2
fbe4eebe17 Prioritize powered networks, fixes a glitch with tunnels connecting. 2014-06-08 11:26:33 -05:00
AlgorithmX2
7a3f2dcf5a Don't call Grid cache updates if the grid is empty. 2014-05-20 09:37:53 -05:00
AlgorithmX2
792249f8fd Added Sky Stone Tracking.
Added Meteorite Compass Block / Item.
Added Meteorite Spawner Debug Item.
Some Refactoring.
2014-03-02 02:35:11 -06:00
AlgorithmX2
5264a718f9 New Post Cache Construction Event. 2014-02-07 14:37:34 -06:00
AlgorithmX2
aed1c9b82c Removed Extra Grids Based on API Change. 2014-02-04 10:11:29 -06:00
AlgorithmX2
dfbc8a6c79 ME Tunnel + Network Tool 2014-01-23 10:28:12 -06:00
AlgorithmX2
834e9c04c5 Err too much. 2014-01-20 10:41:37 -06:00
algorithmx2
e9acdcbee2 AE2 First Commit, the dawn of 1.7 hast arrived. 2013-12-27 16:59:59 -06:00